Volunteers are atill needed! If you are interested contact Cheryl 306-332-4685 or drop by the site next to the Youth Centre. The team will be working on sheathing the roof, building stud walls, applying a second coat of stucco and closing in the Greenhouse and Storage Shed.
![]() |
| Michael works to complete the rafters. |
![]() |
| More sand is delivered to mix the stucco! |
![]() |
| Without a hose nearby, the team has to haul water to mix the stucco. Joy brings several containers to the site. |
![]() |
| The mixer is back on site so the stucco work can continue. |
![]() |
| Applying stucco to the interior walls. |
![]() |
| Almost all of the walls have been stuccoed! One and a half panels to go. |
![]() |
| Michael and Charmaine work on the rafters. |
![]() |
| The north wall of the GreenShed. |