Volunteers are atill needed! If you are interested contact Cheryl 306-332-4685 or drop by the site next to the Youth Centre. The team will be working on sheathing the roof, building stud walls, applying a second coat of stucco and closing in the Greenhouse and Storage Shed.
Michael works to complete the rafters. |
More sand is delivered to mix the stucco! |
Without a hose nearby, the team has to haul water to mix the stucco. Joy brings several containers to the site. |
The mixer is back on site so the stucco work can continue. |
Applying stucco to the interior walls. |
Almost all of the walls have been stuccoed! One and a half panels to go. |
Michael and Charmaine work on the rafters. |
The north wall of the GreenShed. |